• kbiukltd

Tyldesley Loop Line, Manchester


The route had become overgrown and was very wet and muddy for much of the year, deterring many users, especially cyclists. On that basis the client chose Flexipave as the selected surfacing, enabling its durability and porosity to maintain access to the trail for a variety of users all year round.

Total area size – 7602m2 x Flexipave at 35mm depth, Stone Age Bronze colour.


Completed 2017





Unit 8 Nexus

Capitol Court

Dodworth

Barnsley

South Yorkshire 

S75 3UD

T: 01422 242880

  • Facebook Social Icon
  • Twitter Social Icon
  • YouTube Social  Icon

Sustainable Porous Paving Solutions

Registered in the United Kingdom No. 07439087         VAT No. 104174846

All content copyright KB Industries UK Ltd 2019